Celina, TX · Collin County

No notary required

Commercial Energy Code Inspection Compliance Form

Permit holders or authorized agents use this form to report commercial energy code inspection compliance to Celina Building Services before scheduling a Building Final inspection.

What this form is

This form represents that a commercial property in Celina complies with the adopted 2024 International Energy Conservation Code and identifies the selected testing compliance methods. The permit holder must submit it to Building Services before a Building Final inspection can be scheduled. It requests the property location, inspected compliance methods, final inspection details, company, inspection date, and the inspector’s ICC Energy Code certification number.

Who needs it

A permit holder or duly authorized agent responsible for reporting commercial energy code compliance before scheduling the property’s Building Final inspection needs this form.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

The form is signed and dated without a notary; the preliminary commissioning report must be provided to the building owner and Building Official at the final document step.

How to submit this form

  1. 1

    Download The Form

    Download the Commercial Energy Code Inspection Compliance Form PDF.

  2. 2

    Complete The Form

    Enter the property location and selected inspected compliance methods, then provide the final inspection and certification details.

  3. 3

    Gather The Required Report

    Provide the preliminary commissioning report to the building owner and Building Official at the final document step.

  4. 4

    Submit To The City

    Submit the form to Celina Building Services before a Building Final inspection can be scheduled.

Frequently asked questions

What is the Commercial Energy Code Inspection Compliance Form for?
It records the selected testing compliance methods and represents that a commercial property in Celina complies with the adopted 2024 International Energy Conservation Code.
Who completes this form?
The permit holder or a duly authorized agent submits the compliance report. The form also asks for the final inspector’s name, signature, company, inspection date, and ICC Energy Code certification number.
How do I submit the Commercial Energy Code Inspection Compliance Form?
The form says to submit the report to Celina Building Services before a Building Final inspection can be scheduled. Check the city website for current contact details.
Do I need a notary for the Commercial Energy Code Inspection Compliance Form?
No. The form has signature and date fields, but no notary block. It also says a preliminary commissioning report must be provided to the building owner and Building Official at the final document step.

Need something notarized?

This Commercial Energy Code Inspection Compliance Form doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.