Celina, TX · Collin County
Commercial Energy Code Plan Review Compliance Form
This form documents a commercial property's energy code compliance for permit holders or authorized agents submitting information to Celina Building Services.
What this form is
The form records a commercial property's compliance with the adopted 2024 International Energy Conservation Code and is required before the city can schedule a Building Final inspection. The submitter selects a compliance method and attaches its compliance report. It also requests the property location, preparer and company information, submission date, and an ICC Energy Code certification number or design professional number.
Who needs it
A commercial building permit holder or authorized agent submits this form and the selected compliance report to Celina Building Services.
How to submit it
Submit the completed form and compliance report to City of Celina Building Services before a Building Final inspection can be scheduled.
About notarization
This form is signed and dated without a notary; the selected compliance method requires an attached compliance report, and a preliminary commissioning report is provided at the final document step.
How to submit this form
- 1
Download The Form
Download the Commercial Energy Code Plan Review Compliance Form.
- 2
Complete The Form
Enter the property location, preparer and company details, submission date, and required certification or design professional number.
- 3
Gather The Compliance Report
Select a compliance method and attach its compliance report.
- 4
Submit To Building Services
Submit the form and compliance report to Celina Building Services before a Building Final inspection can be scheduled.
Frequently asked questions
- What is the Commercial Energy Code Plan Review Compliance Form?
- It records a commercial property's compliance with the adopted 2024 International Energy Conservation Code and requests details about the selected compliance method and preparer.
- Who submits this form?
- The form says the permit holder or a duly authorized agent submits it to Celina Building Services before a Building Final inspection can be scheduled.
- How do I submit the form?
- Submit the completed form and the compliance report for the selected method to City of Celina Building Services before a Building Final inspection can be scheduled.
- Do I need a notary for the Commercial Energy Code Plan Review Compliance Form?
- No. The form is signed and dated without a notary. Attach the selected compliance report; a preliminary commissioning report is provided at the final document step.
Need something notarized?
This Commercial Energy Code Plan Review Compliance Form doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.
