Earthwork Permit Application

Property owners and contractors use this application to request City of Celina permission for proposed earthwork, grading, clearing, or filling activities.

What this form is

The Earthwork Permit Application requests owner, contractor, and site details, including the estimated disturbed area, proposed work dates, floodplain location, and protected-tree information. Celina requires the completed application and Storm Water Pollution Prevention Plan (SWPPP) consent form before earthwork permission; the document also says no grading, clearing, or fill may begin without a SWPPP. A sealed site grading plan and approved erosion control plan may also be required.

Who needs it

Property owners and contractors proposing earthwork, grading, clearing, or fill in Celina should complete the application and submit the required accompanying materials.

How to submit it

Submit the completed application, including the SWPPP Consent Form, to Engineering as a single PDF file. Include a copy of the CSN and NOI if applicable; the document lists an earthwork permit fee based on the disturbed acreage.

About notarization

This document is signed without a notary; the applicant signs and dates the application, and the contractor or builder initials and signs and dates the consent form.

How to submit this form

  1. 1

    Download The Application

    Download the Earthwork Permit Application and its SWPPP Consent Form.

  2. 2

    Complete The Application

    Provide the owner, contractor, and site details requested, then sign and date the application.

  3. 3

    Gather Required Attachments

    Include the SWPPP Consent Form and, if applicable, copies of the CSN and NOI. A grading plan and erosion control plan may also be required.

  4. 4

    Submit To Engineering

    Submit the completed materials to Engineering as a single PDF file.

Frequently asked questions

Do I need a notary for the Earthwork Permit Application?
No. The application and consent form provide signature and date fields, but no notary block. The applicant signs and dates the application, and the contractor or builder initials and signs and dates the consent form.
How do I submit the Earthwork Permit Application?
Submit the completed application and SWPPP Consent Form to Engineering as a single PDF file. Include a copy of the CSN and NOI if applicable.
What information does the application ask for?
It asks for owner, contractor, and property or site information, the estimated disturbed area, proposed grading dates, and whether the site is in a floodplain or has protected trees.
What documents may need to accompany the application?
The requirements list the SWPPP Consent Form and, if applicable, copies of the CSN and NOI. A sealed site grading plan and approved erosion control plan may also be required.