Celina, TX · Collin County

No notary required

Residential Energy Compliance Path

This form records a residential project’s selected energy code compliance path and testing results for submission with a building permit or Certificate of Occupancy.

What this form is

The form identifies the project address and permit number, documents the selected energy compliance option, and certifies design compliance. Submit the first-page compliance path with an application for a building permit or Certificate of Occupancy. The second page records building envelope, duct leakage, and mechanical ventilation testing results and is provided at building completion before final inspections.

Who needs it

Residential project responsible parties and approved third-party testers complete the relevant certifications for a building permit or Certificate of Occupancy.

How to submit it

Submit the compliance path with an application for a building permit or Certificate of Occupancy. Provide the testing certificate at building completion before final inspections; no submission address or method is stated.

About notarization

This document is signed without a notary; responsible parties sign the certifications, and no notarized or sworn attachment is identified.

How to submit this form

  1. 1

    Download The Form

    Download the Residential Energy Compliance Path PDF.

  2. 2

    Complete The Compliance Path

    Enter the project address and permit number, select a compliance option, and complete the applicable certification fields.

  3. 3

    Gather The Design Report

    Attach the appropriate site-specific design compliance report and inspection checklist.

  4. 4

    Submit With The Application

    Submit the compliance path with a building permit or Certificate of Occupancy application.

  5. 5

    Provide Testing Results

    Provide the testing certificate at building completion before final inspections.

Frequently asked questions

What is the Residential Energy Compliance Path?
It documents a residential project's selected energy code compliance option and includes certifications for design compliance and required testing.
When do I submit this form?
Submit the compliance path with an application for a building permit or Certificate of Occupancy. Provide the testing certificate at building completion before final inspections.
Do I need a notary for the Residential Energy Compliance Path?
No. The form has signature fields for responsible parties but does not identify a notarized or sworn attachment.
How do I submit the Residential Energy Compliance Path?
Submit the compliance path with a building permit or Certificate of Occupancy application. Provide the testing certificate before final inspections; the document does not state a submission method.

Need something notarized?

This Residential Energy Compliance Path doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.