McKinney, TX · Collin County

No notary required

Asbestos Survey Certification

Building owners or their agents complete this certification to confirm an asbestos survey was conducted before covered demolition or alteration permits are issued.

What this form is

The City of McKinney requires this signed certification before issuing a demolition or alteration permit for an existing public or commercial building. The signer certifies that an asbestos survey was conducted for the areas being altered or demolished and provides the project address, name, mailing address, phone number, signature, and date. The completed form becomes part of the permit file.

Who needs it

A building owner or agent applying for a demolition or alteration permit for an existing public or commercial building needs this certification.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This document is signed without a notary; the building owner or agent just signs and dates the certification.

How to submit this form

  1. 1

    Download The Form

    Download the Asbestos Survey Certification PDF.

  2. 2

    Complete The Certification

    Enter the project address and the signer’s name, address, and phone number, then sign and date the certification.

  3. 3

    Gather Any Attachments

    The document does not specify attachments to include with this certification.

  4. 4

    Submit With Your Permit

    Submit the signed form to the city department named on the form; check the city website for current contact details.

Frequently asked questions

Do I need a notary for the Asbestos Survey Certification?
No. The building owner or agent signs and dates the certification; the document does not require a notary.
Who completes the Asbestos Survey Certification?
The building owner or their agent completes and signs it to certify that an asbestos survey was conducted for the areas being altered or demolished.
When does McKinney require this certification?
The document says it must be completed before a permit is issued for demolition or alteration work on an existing public or commercial building.
How do I submit the Asbestos Survey Certification?
The document says the signed form becomes part of the permit file. Submit it to the city department named on the form and check the city website for current contact details.

Need something notarized?

This Asbestos Survey Certification doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.