Prosper, TX · Collin County
Daily Work Location Form for Boring in the ROW & Network Nodes
Contractors use this form to report planned boring or network-node work locations in the Town of Prosper’s right-of-way.
What this form is
The form reports daily work details for boring in the right-of-way and network nodes, including contractor and contact information, permit details, work location, date, and scope. The form states that work cannot begin until the ROW Inspector sends email confirmation, and that daily work may be denied if the form is submitted after 9 AM. It also asks about lane closures and 811 locate tickets and includes gas-line affirmations.
Who needs it
Prime contractors and subcontractors use the form to report planned right-of-way boring or network-node work to the Town of Prosper.
How to submit it
Email the form to ROW Inspectors at @prospertx.gov and copy the ROW Inspector before 9 AM. Work cannot begin until email confirmation is received.
About notarization
No notary is required; the contractor completes the gas-line affirmations and initials the box for all boring work.
How to submit this form
- 1
Download The Form
Download the Daily Work Location Form for boring in the ROW and network nodes.
- 2
Complete Required Fields
Enter the contractor, permit, contact, location, date, and work-scope details, then complete the applicable responses and affirmations.
- 3
Review The Form
Check the required fields and initial the box to affirm for all boring work.
- 4
Email The Form
Email it to ROW Inspectors at @prospertx.gov and copy the ROW Inspector before 9 AM.
Frequently asked questions
- Do I need a notary for this form?
- No. The form has no notary block; the contractor completes the gas-line affirmations and initials the box for all boring work.
- How do I submit the form?
- Email it to ROW Inspectors at @prospertx.gov and copy the ROW Inspector before 9 AM. The form says work cannot begin until email confirmation is received.
- What information does the form ask for?
- It requests contractor and contact details, permit information, the work location and date, work scope, lane-closure and 811 locate ticket responses, and gas-line affirmations.
- When may the daily work be denied?
- The form says daily work may be denied if the form is submitted after 9 AM.
Need something notarized?