Cockrell Hill, TX · Dallas County

No notary required

Third-Party Review and Compliance Notice

Qualified third-party professionals submit this notice to Cockrell Hill for residential solar, battery storage, or backup-generator plan review or inspection.

What this form is

This notice records a qualified third-party professional’s review of plans or inspection of a residential solar, battery storage, or backup-generator project. The city says to submit it with the permit application for plan review, or after a passing inspection for permit closeout. It requests project and reviewer details, a compliance declaration, notice type, attachments, and the professional’s dated signature.

Who needs it

A qualified third-party professional submits this notice for plan review or after a passing inspection on a covered residential project.

How to submit it

Submit it to the City of Cockrell Hill with the permit application for plan review, or after a passing inspection for permit closeout. The form lists 4125 W. Clarendon Drive, Cockrell Hill, Texas 75211.

About notarization

This form is signed and dated without a notary; it requires no sworn or notarized attachment.

How to submit this form

  1. 1

    Download The Notice

    Download the Third-Party Review and Compliance Notice PDF.

  2. 2

    Complete The Project Details

    Enter the project address, owner, project type, permit application number if known, and reviewer or inspector information.

  3. 3

    Attach Supporting Documents

    For plan review, attach the plans and review report. For final inspection, attach the inspection report.

  4. 4

    Sign And Submit

    The third-party professional signs and dates the form, then submits it with the permit application or after a passing inspection.

Frequently asked questions

What is the Third-Party Review and Compliance Notice for?
It records a qualified professional’s review of development documents or inspection of improvements for a residential solar, battery storage, or backup-generator project.
When should I submit the notice?
Submit it with the permit application for plan review. For inspections, submit it after a passing inspection to finalize permit closeout.
Do I need a notary for this notice?
No. The professional signs and dates this form without a notary, and the form does not identify a sworn or notarized attachment.
How do I submit the notice?
Submit it to the City of Cockrell Hill with the permit application for plan review, or after a passing inspection for permit closeout.

Need something notarized?

This Third-Party Review and Compliance Notice doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.