Garland, TX · Dallas County
Engineering First Submittal Form
Engineers, surveyors, developers, and owners use this form to identify project details and included materials for a first engineering submittal.
What this form is
This form covers first submittals for schematic engineering plans, construction plans, or a working plat. It asks for project details, contact information, submission type, and a checklist of the plans and supporting documents included. The form says submittals go to the Engineering Department electronically and that no fee or application is required until issuance of a Site Permit.
Who needs it
Engineers, surveyors, developers, or owners submitting schematic engineering plans, construction plans, or a working plat should complete this form.
How to submit it
Email PDF/electronic submittals to the Development Engineering Group; hard copies will not be accepted. The form says no Engineering Department fee or application is required until issuance of a Site Permit.
About notarization
This document is signed without a notary; it does not identify a notarized or sworn attachment, so the signer just signs and dates it.
How to submit this form
- 1
Download the Form
Download the Engineering First Submittal Form PDF.
- 2
Complete Project Details
Enter the project name, address, subdivision or lot details, submission type, and engineer or surveyor and developer or owner contact information.
- 3
Gather and Identify Submittal Items
Use the applicable checklist to identify included plans and supporting documents for schematic plans, construction plans, or a working plat.
- 4
Email the Submittal
Email the PDF/electronic submittal to the Development Engineering Group; the form says hard copies will not be accepted.
Frequently asked questions
- Do I need a notary for the Engineering First Submittal Form?
- No. This form has no notary block and does not identify a notarized or sworn attachment; the signer just signs and dates it.
- How do I submit the Engineering First Submittal Form?
- Email the PDF/electronic submittal to the Development Engineering Group. The form states that hard copies will not be accepted.
- What information and documents does the form ask for?
- It asks for project and contact details, submission type, and a checklist of plans and supporting documents included with the first submittal.
Need something notarized?
This Engineering First Submittal Form doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.
