Sachse, TX · Dallas County

No notary required

Small Cells Right-of-Way Permit Application

This application is for facility owners and contractors seeking a Sachse permit to construct small-cell facilities in the public right-of-way.

What this form is

Facility owners and contractors use this application to request a permit for small-cell right-of-way construction. The form asks for company and project details, facility locations, anticipated start and completion dates, and signatures from the facility owner, contractor, and subcontractor. It also lists required supporting materials, including plans and, when applicable, a traffic control plan; the registration form must be completed and approved before a right-of-way permit application is submitted.

Who needs it

Facility owners and their contractors and subcontractors submit this application when seeking a permit for small-cell construction in Sachse’s public right-of-way.

How to submit it

Submit the completed application and supporting documents in person at City Hall, Engineering Department, or by email to [email protected]. Include the required plans and, when applicable, a site-specific traffic control plan.

About notarization

The application is signed and dated without a notary; no notarized or sworn attachment is identified.

How to submit this form

  1. 1

    Download The Application

    Download the Small Cells Right-of-Way Permit Application PDF.

  2. 2

    Complete The Application

    Fill in the company, facility, and project details, and complete all required fields.

  3. 3

    Gather Supporting Documents

    Include plans and maps; provide a site-specific traffic control plan if a traffic lane or sidewalk closure is required.

  4. 4

    Sign And Submit

    Obtain the required signatures and submit the application and supporting documents in person at City Hall, Engineering Department, or by email.

Frequently asked questions

Do I need a notary for the Small Cells Right-of-Way Permit Application?
No. The application calls for signatures and dates from the facility owner, subcontractor, and contractor, but does not identify a notarized or sworn attachment.
How do I submit the Small Cells Right-of-Way Permit Application?
Submit the completed application and supporting documents in person at City Hall, Engineering Department, or by email to [email protected].
What supporting documents are required?
The instructions call for plans in digital or paper format and a copy of all maps. If a traffic lane or sidewalk closure is required, submit a detailed site-specific traffic control plan.
Who must sign the application?
The application says signatures are required from the facility owner, subcontractor, and contractor. All application pages must be complete with the applicant’s signature and date before processing.

Need something notarized?

This Small Cells Right-of-Way Permit Application doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.