Right of Way Permit Application

Utility applicants use this application to request a Providence Village right of way permit and provide excavation, contractor, and subcontractor information.

What this form is

Utilities complete this application to request a right of way permit for excavation in Providence Village. It asks for applicant, excavation, contractor, subcontractor, and utility certification details. At submittal, applicants must also provide plans, identification, a registration fee, and performance and maintenance bonds; contractor registration is required before a permit is issued.

Who needs it

Utilities seeking a right of way permit must complete the application and provide the required supporting materials and contractor registration.

How to submit it

The form lists Town Hall at 1755 Main Street, Providence Village, TX 76227, and [email protected]. After submitting the form, contact Town Hall to pay the registration fee and provide the required materials.

About notarization

This application is signed and dated without a notary; the listed plans, identification, fee, and bonds are required, but no notarized attachment is identified.

How to submit this form

  1. 1

    Download The Application

    Download the Right of Way Permit Application PDF.

  2. 2

    Complete The Application

    The utility fills in the applicant, excavation, contractor, subcontractor, and utility certification information, then signs and dates the form.

  3. 3

    Gather Required Materials

    Prepare a digital copy and three physical sets of plans, valid applicant identification, the registration fee, and the required performance and maintenance bonds.

  4. 4

    Submit To The Town

    Submit the application and required materials, then contact Town Hall to pay the registration fee. The form lists Town Hall's address and [email protected].

Frequently asked questions

Who fills out the Right of Way Permit Application?
The form states that the utility must fill out the application. It collects details about the applicant, excavation, general contractor, and subcontractors.
What must accompany the application?
Applicants must provide a digital copy and three physical sets of plans, valid applicant identification, the registration fee, and performance and maintenance bonds.
How do I submit the Right of Way Permit Application?
The form lists Town Hall at 1755 Main Street and [email protected]. Contact Town Hall after submitting the form to pay the registration fee and provide the required materials.
Do I need a notary for the Right of Way Permit Application?
No. The application has a signature and date line but no notary block. It lists plans, identification, a fee, and bonds as required materials, without identifying a notarized attachment.

Need something notarized?

This Right of Way Permit Application doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.