Sanger, TX · Denton County

No notary required

Early Grading Permit Application

Property owners use this application to request permission from Sanger for early grading before construction plans and a plat are approved.

What this form is

The application requests owner, contractor, and property information, estimated disturbed land area, SWPPP status, flood hazard information, and proposed grading dates. Sanger regulations require a written owner request and prior approval before grading, clearing, or fill begins. The form lists an engineer-sealed erosion control plan and, if applicable, a copy of the Contractors/Owners Notice of Intent as attachments.

Who needs it

A property owner seeking permission for early grading before construction plans and a plat are approved should complete this application and the listed requirements.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This document is signed without a notary; the owner signs and dates the application, and the contractor signs and dates the construction waste consent form.

How to submit this form

  1. 1

    Download The Application

    Download the Early Grading Permit Application PDF.

  2. 2

    Complete The Application

    Provide owner, contractor, property, site, and proposed grading information, then sign and date the application.

  3. 3

    Gather The Attachments

    Attach an engineer-sealed erosion control plan and a copy of the Contractors/Owners Notice of Intent, if applicable.

  4. 4

    Submit To The City

    Submit it to the city department named on the form; check the city website for current contact details.

Frequently asked questions

What does the Early Grading Permit Application do?
It requests permission for early grading and collects owner, contractor, and site details, grading dates, and information about SWPPP preparation and flood hazard location.
What attachments are required?
The application lists an erosion control plan sealed by a licensed engineer and a copy of the Contractors/Owners Notice of Intent, if applicable. Additional requirements for early grading are listed in the document.
Do I need a notary for the Early Grading Permit Application?
No. This document is signed without a notary; the owner signs and dates the application, and the contractor signs and dates the construction waste consent form.
How do I submit the Early Grading Permit Application?
Submit it to the city department named on the form; check the city website for current contact details.