Agreement for Interconnection and Parallel Operation of Cogeneration or Small Generation Installation

This agreement sets terms for a Sanger customer or small generator seeking to connect a qualifying power-generating installation to the city’s electric distribution system.

What this form is

The agreement defines the responsibilities and conditions for interconnection and parallel operation of a qualifying residential or commercial/industrial generating installation. Before interconnection, the small generator must apply and comply with city rules, submit an interconnection application with a permit application, and provide electrical plans signed and stamped by a licensed Professional Engineer. The agreement asks for customer and generator details and signatures from the customer and City of Sanger.

Who needs it

A Sanger residential or commercial/industrial customer seeking to interconnect a qualifying power-generating installation with the city’s electric distribution system needs this agreement.

How to submit it

Submit the interconnection application and permit application, along with required plans and this agreement, to the Economic & Community Development Department.

About notarization

This agreement is signed and dated without a notary; its electrical plans must be signed and stamped by a licensed Professional Engineer.

How to submit this form

  1. 1

    Download The Agreement

    Download the generation interconnection agreement.

  2. 2

    Complete The Agreement

    Fill in the customer, generating installation, account, and emergency contact details, then sign and date the agreement.

  3. 3

    Gather Required Documents

    Prepare the interconnection and permit applications and electrical plans signed and stamped by a licensed Professional Engineer.

  4. 4

    Submit To The City

    Submit the agreement, applications, and required plans to the Economic & Community Development Department.

Frequently asked questions

What does the generation interconnection agreement do?
It sets terms and responsibilities for connecting and operating a qualifying small power-generating installation in parallel with the City of Sanger’s electric distribution system.
What information and attachments are required?
The agreement requests generator, customer account, and emergency contact details. The interconnection application must include electrical plans signed and stamped by a licensed Professional Engineer, and a permit application.
Do I need a notary for the generation interconnection agreement?
No. The agreement is signed and dated without a notary; its electrical plans must be signed and stamped by a licensed Professional Engineer.
How do I submit the generation interconnection agreement?
Submit the interconnection application and permit application, along with required plans and this agreement, to the Economic & Community Development Department.

Need something notarized?