Stephenville, TX · Erath County
Sign Permit Application
Property owners or applicants use this application to request a Stephenville sign permit and provide project, property, sign, and contractor information.
What this form is
The Sign Permit Application is for requesting a permit to erect or alter a sign in Stephenville. It asks for property and project details, sign type and dimensions, work description, valuation, and applicant, owner, and contractor information. Include the applicable site plan and sign drawings described on the second page; staff review takes at least 48 hours, and no work may begin until a permit is issued.
Who needs it
Property owners or applicants planning sign work in Stephenville should complete this application and submit the listed plans and drawings before a permit is issued.
How to submit it
Submit the application and required items to the office of the Building Inspector. The form lists [email protected] for Development Services.
About notarization
This document is signed and dated without a notary; the application lists no sworn or notarized attachment, so the applicant just signs and dates it.
How to submit this form
- 1
Download The Application
Download the Sign Permit Application PDF.
- 2
Complete The Application
Enter the project, property, sign, work, valuation, applicant, owner, and contractor information requested.
- 3
Gather Required Plans
Include the applicable site plan and sign drawings described on the second page; other items may be needed in certain conditions.
- 4
Submit To The City
Submit the application and items to the office of the Building Inspector. The form lists [email protected] for Development Services.
Frequently asked questions
- Do I need a notary for the Sign Permit Application?
- No. The application calls for the applicant’s signature and date but has no notary block or sworn attachment; the signer just signs and dates it.
- How do I submit the Sign Permit Application?
- Submit the application and required items to the office of the Building Inspector. The form lists [email protected] for Development Services.
- What should I include with the application?
- The form lists a site plan, sign detail, and digital plan as possible inclusions. Its second page describes site plan and sign drawing requirements, which vary by sign type.
- Can sign work begin as soon as I submit the application?
- No. The form states that no work may be performed until a permit has been issued and that staff review takes at least 48 hours.
Need something notarized?
This Sign Permit Application doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.
