Sherman, TX · Grayson County

No notary required

Building Permit Plan Revisions Form

This form lets contractors request revisions to a commercial or residential building permit by submitting revised plans and describing the changes.

What this form is

Use this form only for revisions to a commercial or residential building permit. It asks for the project address, permit number, contractor contact information, affected page or plan sheet, applicable codes, and a detailed description of the revision; upload it with revised plans that clearly cloud each change.

Who needs it

A contractor seeking revisions to a commercial or residential building permit should complete and upload this form with the revised plans.

How to submit it

Upload the completed form and revised plans through the online portal, with all revisions clearly clouded. After uploading, email [email protected] and monitor the submittal for status changes.

About notarization

No notary is required; the form includes a date field but no signature line or notarized attachment.

How to submit this form

  1. 1

    Download The Form

    Download the Building Permit Plan Revisions Form.

  2. 2

    Complete The Form

    Enter the project and contractor details, affected plan pages or sheets, applicable codes, and a detailed description of the revision.

  3. 3

    Prepare Revised Plans

    Gather the revised plans and clearly cloud all revisions to show the changes made.

  4. 4

    Upload And Email

    Upload the form and revised plans through the online portal, then email [email protected].

Frequently asked questions

Do I need a notary for the Building Permit Plan Revisions Form?
No. The form includes a date field but no signature line or notarized attachment.
How do I submit the Building Permit Plan Revisions Form?
Upload the form and revised plans through the online portal, clearly clouding each revision. Then email [email protected].
What information does the form request?
It asks for the project address, permit number, contractor contact details, affected page or plan sheet, applicable codes, and a detailed description of the revision.
How long does review typically take?
The form says revisions typically require approximately 15 business days for review. Inspections cannot proceed until the revisions are approved.

Need something notarized?

This Building Permit Plan Revisions Form doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.