Seguin, TX · Guadalupe County
Application for Construction of Electric Service
Electricians, electrical engineers, or homestead owners use this application to coordinate proposed electric service construction with the City of Seguin.
What this form is
This application coordinates construction of electric service between the City of Seguin and the electrician doing the proposed work; it is separate from the application for actual service and the service deposit. It asks for building, occupancy, electrician, and service details, plus a site plan and one-line diagram. Charges are determined after review, and the form says they must be paid before a permit is issued.
Who needs it
A master electrician, electrical engineer, or homestead owner submits this application to coordinate proposed electric service construction with the city.
How to submit it
For submission: Submit it to the city department named on the form; check the city website for current contact details.
About notarization
This document is signed and dated without a notary; the form asks for a site plan and one-line diagram, and the signer just signs and dates it.
How to submit this form
- 1
Download The Application
Download the electric service construction application PDF.
- 2
Complete The Application
Fill in the building, occupancy, electrician, and applicable electric service details clearly and completely.
- 3
Gather The Attachments
Attach a dimensioned site plan showing the service location and a one-line diagram of the electrical equipment and conductor and conduit sizes.
- 4
Sign And Submit
Sign and date the application, then submit it to the city department named on the form; check the city website for current contact details.
Frequently asked questions
- What is the electric service construction application for?
- It coordinates proposed electric service construction between the City of Seguin and the electrician doing the work. Actual service and the deposit require a separate application.
- What attachments does the application require?
- Attach a dimensioned site plan showing the electric service location and a one-line diagram showing conductor and conduit sizes, panel boards, and related electrical apparatus.
- Do I need a notary for the electric service construction application?
- No. The application has no notary block; the signer signs and dates it. It asks for a site plan and one-line diagram, not a notarized attachment.
- How do I submit the electric service construction application?
- Submit it to the city department named on the form; check the city website for current contact details.
