Silsbee, TX · Hardin County

No notary required

Demolition Permit Application

This application requests a City of Silsbee building demolition permit and is completed by the property owner or authorized agent for proposed demolition work.

What this form is

Use this application to request a City of Silsbee permit to demolish a building. It asks for the job location, owner and contractor details, building characteristics, work description, estimated completion time, and whether an asbestos survey has been completed; the form says a survey must be done before a permit can be issued for commercial remodel or demolition.

Who needs it

A property owner or authorized agent seeking a City of Silsbee permit to demolish a building should complete this application.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This application is signed without a notary; it mentions no notarized or sworn attachment, so the applicant signs and dates it.

How to submit this form

  1. 1

    Download The Application

    Download the Demolition Permit Application PDF.

  2. 2

    Complete The Application

    Enter the job, owner, contractor, building, and work details, and indicate whether the asbestos survey has been completed.

  3. 3

    Complete The Asbestos Survey

    For commercial remodel or demolition, the form says an asbestos survey must be done before a permit can be issued.

  4. 4

    Submit To The City

    Submit the completed application to the city department named on the form; check the city website for current contact details.

Frequently asked questions

Do I need a notary for the Demolition Permit Application?
No. The application has a signature and date line but no notary block, and it mentions no notarized or sworn attachment.
How do I submit the Demolition Permit Application?
The form does not give submission instructions. Submit it to the city department named on the form; check the city website for current contact details.
What information does the application ask for?
It requests job location, owner and contractor information, building details, a work description, estimated completion time, and asbestos survey status.
Is an asbestos survey required?
The form states that for commercial remodel or demolition, an asbestos survey of the property must be done before a permit can be issued.

Need something notarized?

This Demolition Permit Application doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.