Smyer, TX · Hockley County

No notary required

Building Permit Application

This application is for anyone seeking a building permit in Smyer and asks for project details, applicant information, and a drawing of the proposed project.

What this form is

The City of Smyer Building Permit Application is used to request approval for a construction or installation project in the city. It asks for the applicant’s contact information, project location, and details about the work, including plans and contractor identity for an on-site project. Applicants must include a drawing showing measurements of the lot, structures, and distances to structures or property lines.

Who needs it

Applicants proposing construction or installation in Smyer, including manufactured homes or other structures moved into the city, use this application.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This application has a signature line and no notary block; the applicant signs and dates it and includes a drawing of the proposed project.

How to submit this form

  1. 1

    Download The Application

    Download the Smyer Building Permit Application PDF.

  2. 2

    Complete The Application

    Provide applicant contact information, the project location, and the details requested for your type of project.

  3. 3

    Gather The Drawing And Plans

    Include a measured drawing of the proposed project; provide plans and specifications for an on-site project.

  4. 4

    Sign And Date

    Sign and date the application.

  5. 5

    Submit To The City

    Submit it to the city department named on the form; check the city website for current contact details.

Frequently asked questions

What does the Smyer Building Permit Application ask for?
It asks for applicant contact details, the project location, and project-specific information such as plans, specifications, contractor identity, and expected completion time.
What drawing should I include with the application?
Include a drawing of the proposed project with measurements for the lot, existing and proposed structures, and distances to structures or property lines.
Do I need a notary for the Smyer Building Permit Application?
No. The application has a signature line but no notary block; the applicant signs and dates it and includes the proposed-project drawing.
How do I submit the Smyer Building Permit Application?
Submit it to the city department named on the form; check the city website for current contact details.

Need something notarized?

This Building Permit Application doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.