Post Oak Bend, TX · Kaufman County
Swimming Pool Inspection Request
Contractors use this swimming pool inspection request to schedule required inspections and report their dates to Post Oak Bend Building Inspections.
What this form is
This page provides the procedure and spaces for recording required swimming pool inspection dates. Contractors schedule inspections with Bureau Veritas and, after all required inspections are complete, return the page with the dates noted. It lists inspection types and pool construction notes, including temporary and permanent fence requirements and keeping approved documents on site.
Who needs it
Contractors responsible for scheduling required swimming pool inspections use this page to record inspection dates and return them to the city.
How to submit it
Schedule inspections with Bureau Veritas at 800-906-7199 or [email protected]. After all required inspections, return this page with the inspection dates to [email protected].
About notarization
This document is signed without a notary; it asks for inspection dates, and the signer just signs and dates it if applicable.
How to submit this form
- 1
Download The Inspection Page
Download the swimming pool inspection page to record the inspection dates.
- 2
Schedule Required Inspections
Contractors schedule required inspections with Bureau Veritas at 800-906-7199 or [email protected].
- 3
Record Inspection Dates
After all required inspections, note their dates on the page.
- 4
Return The Completed Page
Email the page with the inspection dates to [email protected].
Frequently asked questions
- Do I need a notary for the Swimming Pool Inspection Request?
- No. The document has no notary block or notarization instructions; it asks contractors to note inspection dates and return the page.
- How do I submit the Swimming Pool Inspection Request?
- Schedule inspections with Bureau Veritas by phone at 800-906-7199 or email at [email protected]. After all required inspections, email the page with dates to [email protected].
- Who uses this swimming pool inspection page?
- Contractors responsible for scheduling required inspections use it to record the inspection dates and return the completed page to the city.
- What inspections are listed on the page?
- It lists belly steel, deck steel, and final inspections, along with an optional space for other items such as a gas test, existing electrical changes, or retaining walls.
