Woodway, TX · McLennan County
Final Plat/Replat Submittal Form
Applicants use this form to submit a final plat, replat, or amended plat for consideration by the City of Woodway Planning & Zoning Commission.
What this form is
Use this form when submitting an acreage plat, replat, or amended plat for consideration by the Planning & Zoning Commission. It requests applicant contact details, meeting dates, and current and proposed legal descriptions. The document lists the required plat copies and content, including proposed streets, easements, utilities, drainage, and studies, and gives the City Engineer delivery instructions.
Who needs it
A person or organization submitting an acreage plat, replat, or amended plat for Planning & Zoning Commission consideration should complete this form.
How to submit it
Deliver the required paper and electronic copies to the City Engineer at least twenty-five days before the Planning & Zoning Commission meeting. The form lists a $250 fee payment checkbox for office use.
About notarization
This document is signed without a notary; the form identifies no notarized attachment, and the applicant signs and dates it.
How to submit this form
- 1
Download The Form
Download the Final Plat/Replat Submittal Form PDF.
- 2
Complete The Form
Provide applicant information, meeting dates, plat type, and current and proposed legal descriptions; sign and date it.
- 3
Prepare Plat Copies
Prepare four 18-by-24-inch paper copies, one 11-by-17-inch paper copy, and one electronic copy in a City-approved format.
- 4
Deliver To The City Engineer
Deliver the copies to the City Engineer at least 25 days before the Planning & Zoning Commission meeting.
Frequently asked questions
- Do I need a notary for the Final Plat/Replat Submittal Form?
- No. The form has no notary block or notarized attachment identified; the applicant signs and dates the form.
- How do I submit the Final Plat/Replat Submittal Form?
- Deliver four 18-by-24-inch paper copies, one 11-by-17-inch paper copy, and one electronic copy in a City-approved format to the City Engineer at least 25 days before the meeting.
- What information does the form request?
- It asks for applicant contact information, meeting dates, the current legal description, and the proposed legal description, including all lots, blocks, and the addition name.
- What must the plat include?
- The document lists subdivision, ownership, designer, street, easement, utility, drainage, topography, vicinity map, land-use, and study information as minimum content.
Need something notarized?
This Final Plat/Replat Submittal Form doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.
