Fire Sprinkler Plan Submittal Requirements

This checklist helps fire sprinkler contractors verify that required information and supporting materials are included with a plan submittal to the city.

What this form is

Fire sprinkler contractors use this checklist to indicate whether required information is included with their plan submittal, or explain why an item is not required. It covers contractor and owner details, permits, building and system information, water supply documentation, and hydraulic calculations. The checklist calls for a City water flow test hard copy and specifies that the test must be conducted within 12 months of the submittal date.

Who needs it

Fire sprinkler contractors submitting plans should use this checklist to confirm required plan information and supporting materials are included.

How to submit it

The document does not provide submission contact details. Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This document is signed without a notary; the contractor marks the checklist and signs it, and no notarized or sworn attachment is identified.

How to submit this form

  1. 1

    Download The Checklist

    Download the Fire Sprinkler Plan Submittal Requirements PDF.

  2. 2

    Complete The Checklist

    Check each box for information included with the submittal; leave a box blank and state why if the information is not required.

  3. 3

    Gather Supporting Materials

    Include the required plan information and supporting materials, including the City water flow test hard copy and hydraulic calculations.

  4. 4

    Submit To The City

    The document does not provide submission contact details. Submit it to the city department named on the form; check the city website for current contact details.

Frequently asked questions

What is the Fire Sprinkler Plan Submittal Requirements checklist?
It is a checklist for fire sprinkler contractors to indicate which required information and supporting materials are included with a plan submittal, or explain why an item is not required.
What supporting materials does the checklist mention?
It calls for an owner’s certificate, applicable underground permits, and a hard copy of a City water flow test, along with plan information and hydraulic calculations.
Do I need a notary for the Fire Sprinkler Plan Submittal Requirements checklist?
No. The document is signed without a notary; the contractor marks the checklist and signs it, and no notarized or sworn attachment is identified.
How do I submit the Fire Sprinkler Plan Submittal Requirements checklist?
The document does not provide submission contact details. Submit it to the city department named on the form; check the city website for current contact details.

Need something notarized?

This Fire Sprinkler Plan Submittal Requirements doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.