Corpus Christi, TX · Nueces County

No notary required

Standpipe Plan Submittal Requirement

Contractors use this checklist to indicate whether required standpipe plan information is included in a project submittal to the city.

What this form is

This checklist helps contractors identify the information included with a standpipe plan submittal. It asks about sprinkler and underground systems, fire pumps, standpipe risers, and required plan details, including water-supply information and hydraulic calculations. The checklist also specifies that a water-flow test hard copy from the city’s Water Department must accompany the plans.

Who needs it

Contractors submitting standpipe plans to the city use this checklist to confirm required information is included or explain why an item is not required.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This document is signed without a notary; it identifies no sworn or notarized attachment, and the required RME signs and prints their name.

How to submit this form

  1. 1

    Download The Checklist

    Download the Standpipe Plan Submittal Requirement PDF.

  2. 2

    Complete The Checklist

    Answer the system questions and mark each required item included, or mark NR and state why it is not required.

  3. 3

    Gather Plan Materials

    Include the required plan information and a hard copy of the water-flow test conducted by the city Water Department.

  4. 4

    Sign And Submit

    Have the same RME who signed the plans sign the checklist, print their name, and submit it to the city department named on the form.

Frequently asked questions

What does the Standpipe Plan Submittal Requirement checklist cover?
It lists information to provide with standpipe plans, including system details, occupant and building information, water-supply details, calculations, and a water-flow test hard copy.
Do I need a notary for the Standpipe Plan Submittal Requirement?
No. This document is signed without a notary; it identifies no sworn or notarized attachment, and the required RME signs and prints their name.
How do I submit the standpipe plan checklist?
Submit it to the city department named on the form; check the city website for current contact details.

Need something notarized?

This Standpipe Plan Submittal Requirement doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.