Corpus Christi, TX · Nueces County
Underground Fire Plan Submittal Requirements
This checklist helps contractors and design professionals prepare underground fire plans for submittal to the city.
What this form is
Use this checklist when preparing underground fire plans for submittal to the city. It identifies information and plan details to provide, including the RME’s name, state license number, signature, and underground fire main permit number. It also calls for water supply information and hydraulic calculations, plus a hard copy of a waterflow test conducted by the Corpus Christi Water Department within 12 months of the submittal date.
Who needs it
Contractors and design professionals preparing underground fire plans for city submittal should use this checklist to review the required plan details.
How to submit it
Submit it to the city department named on the form; check the city website for current contact details.
About notarization
This document is signed without a notary; the form calls for the RME to sign and date it, and identifies no notarized or sworn attachment.
How to submit this form
- 1
Download The Checklist
Download the Underground Fire Plan Submittal Requirements PDF.
- 2
Complete The Checklist
Review the listed plan details and fill in the print name, telephone number, signature, and RME number.
- 3
Gather Supporting Materials
Include the listed plan information and a hard copy of the waterflow test conducted by the Corpus Christi Water Department.
- 4
Submit To The City
Submit it to the city department named on the form; check the city website for current contact details.
Frequently asked questions
- What is the Underground Fire Plan Submittal Requirements checklist?
- It lists information and plan details to provide with underground fire plans, including RME credentials, fire protection piping, water supply information, and hydraulic calculations.
- Who uses this checklist?
- Contractors and design professionals preparing underground fire plans for submittal to Corpus Christi can use it to check that the listed plan information is provided.
- Do I need a notary for the Underground Fire Plan Submittal Requirements?
- No. The document has no notary block; it calls for the RME to sign and date it and lists no notarized or sworn attachment.
- How do I submit the Underground Fire Plan Submittal Requirements?
- Submit it to the city department named on the form; check the city website for current contact details.
Need something notarized?
This Underground Fire Plan Submittal Requirements doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.
