Livingston, TX · Polk County
Sign Permit Application
This application is for contractors seeking a City of Livingston permit to install a sign at a project address.
What this form is
Use this application to request a sign permit from the City of Livingston. It asks for the project address, business and contractor information, sign type and details, and contractor signature and date. The form requires two sets of engineered drawings signed, sealed, and dated, plus a detailed site plan or survey; it says to allow up to 10 working days for review.
Who needs it
Contractors seeking a City of Livingston permit for a sign should complete the application and provide the listed drawings and site plan or survey.
How to submit it
The form lists the City of Livingston at 200 W Church, Livingston, Texas 77351, and identifies the Building Division for approval. It does not state a submission method.
About notarization
This application is signed and dated without a notary; the signer just signs and dates it, and the form lists no notarized or sworn attachment.
How to submit this form
- 1
Download the Application
Download the City of Livingston Sign Permit Application PDF.
- 2
Complete the Application
Enter the project address, business and contractor information, sign type and details, then sign and date the form.
- 3
Gather the Required Documents
Prepare two sets of signed, sealed, and dated engineered drawings and a detailed site plan or survey.
- 4
Submit to the City
The form lists the City at 200 W Church, Livingston, Texas 77351, and identifies the Building Division for approval.
Frequently asked questions
- Do I need a notary for the Sign Permit Application?
- No. The application calls for a contractor signature and date, but does not require notarization or mention a sworn attachment.
- How do I submit the Sign Permit Application?
- The form lists the City of Livingston at 200 W Church, Livingston, Texas 77351, and names the Building Division for approval. It does not specify how to submit the application.
- What must accompany the Sign Permit Application?
- The form requests two sets of engineered drawings signed, sealed, and dated, plus a detailed site plan or survey showing property lines, setbacks, and sign placement.
- How long does sign permit review take?
- The application asks applicants to allow up to 10 working days for the review process.
