Haslet, TX · Tarrant County
Sub-Surface Drilling Permit Application – Gas Wells
This application is for applicants seeking a Haslet permit for gas-well subsurface directional or slant drilling operations.
What this form is
Use this application for proposed subsurface directional or slant drilling operations involving gas wells in Haslet. It asks for applicant and emergency contact details, the mineral rights owner, well location and description, and proposed drilling depth and specifications. The form lists supporting materials, including a site plan, legal descriptions, 11 complete copies, proof of a $50,000 surety bond or letter of credit, and insurance documentation.
Who needs it
Applicants proposing subsurface directional or slant drilling operations for gas wells in Haslet should complete this permit application.
How to submit it
Submit it to the city department named on the form; check the city website for current contact details.
About notarization
This application is signed without a notary; the signer just signs and dates it, and the listed attachments do not state a notarization requirement.
How to submit this form
- 1
Download The Application
Download the Sub-Surface Drilling Permit Application – Gas Wells PDF.
- 2
Complete The Application
Fill in the applicant and contact details, well location and description, and proposed drilling information.
- 3
Gather The Listed Attachments
Prepare the listed supporting documents, including a site plan, legal descriptions, 11 complete copies, bond or credit proof, and insurance documentation.
- 4
Submit To The City
Submit the application to the city department named on the form; check the city website for current contact details.
Frequently asked questions
- What is the Haslet gas-well drilling permit application for?
- It is for proposed subsurface directional or slant drilling operations involving gas wells and requests applicant, contact, well, and drilling details.
- What attachments does the application list?
- The list includes a site plan, legal descriptions, 11 complete copies, proof of a $50,000 surety bond or letter of credit, and current insurance documentation.
- Do I need a notary for the Haslet gas-well drilling permit application?
- No. The application has a signature line and date field, but no notary block; its listed attachments do not state a notarization requirement.
- How do I submit the Haslet gas-well drilling permit application?
- Submit it to the city department named on the form; check the city website for current contact details.
Need something notarized?
This Sub-Surface Drilling Permit Application – Gas Wells doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.
