Mansfield, TX · Tarrant County

No notary required

Emergency Responder Communication System Permit Application

Mansfield Fire Department’s permit application is for applicants installing an emergency responder communication system in a building.

What this form is

Use this application to request a permit for an emergency responder communication system installation; the document states a permit is required for all such installations. It asks for the property and company details, contact information, and state license or certification number. Submit plans, the application, specification books, and a copy of the company COR; multiple buildings require a separate application and permit for each building.

Who needs it

Applicants installing an emergency responder communication system in Mansfield need this application; public safety communications projects require a licensed fire protection engineer’s third-party review before submittal.

How to submit it

Submit the plans, application, specification books, and a copy of the company COR to the Mansfield Fire Department at 1305 E. Broad St., Mansfield, TX 76063. Payment instructions will be emailed to the address provided.

About notarization

This document does not require notarization; it identifies no sworn attachment or step, and the application text does not specify a signer’s signature or date.

How to submit this form

  1. 1

    Download The Application

    Download the Emergency Responder Communication System Permit Application PDF.

  2. 2

    Complete The Application

    Provide the property, company, contact, and state license or certification details requested.

  3. 3

    Gather Required Documents

    Prepare the plans, specification books, and a copy of the company COR. Each building requires a separate application and permit.

  4. 4

    Submit To The Fire Department

    Submit the application and documents to the Mansfield Fire Department at 1305 E. Broad St., Mansfield, TX 76063.

Frequently asked questions

Do I need a notary for the Emergency Responder Communication System Permit Application?
No. The document does not require notarization and identifies no sworn attachment or step; it does not specify a signer’s signature or date.
How do I submit the Emergency Responder Communication System Permit Application?
Submit the application, plans, specification books, and a copy of the company COR to the Mansfield Fire Department at 1305 E. Broad St., Mansfield, TX 76063.
What information does the application ask for?
It asks for the property address and name, construction or remodel status, company and contact details, and state license or certification number.
Are there additional requirements for these installations?
Public safety communications projects require a third-party review by a fire protection engineer licensed in Texas before submittal. Multiple buildings require an application and permit for each building.

Need something notarized?

This Emergency Responder Communication System Permit Application doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.