North Richland Hills, TX · Tarrant County

No notary required

Residential Energy Compliance Path

This checklist identifies an energy code compliance option for residential projects submitted with a building permit or Certificate of Occupancy application.

What this form is

Use this document to identify which of five energy code compliance options applies to a residential project. Submit it with an application for either a building permit or a Certificate of Occupancy. It asks for the project address, selected option, and, for options 2 through 5, the compliance software name and version; it also includes a certification and signature section.

Who needs it

People submitting a residential building permit or Certificate of Occupancy application use this document to identify the project's energy code compliance approach.

How to submit it

Submit this document with the application for either a building permit or a Certificate of Occupancy. The form does not name a department or provide contact details.

About notarization

This document is signed without a notary; it includes a responsible-party signature line and does not identify a notarized attachment or related sworn step.

How to submit this form

  1. 1

    Download The Checklist

    Download the Residential Energy Compliance Path PDF.

  2. 2

    Complete The Project Details

    Enter the project address, select a compliance option, and provide the software name and version if selecting options 2 through 5.

  3. 3

    Gather Required Attachments

    Attach the appropriate site-specific design compliance report and inspection checklist.

  4. 4

    Sign And Submit

    Sign the responsible-party certification and submit the document with a building permit or Certificate of Occupancy application.

Frequently asked questions

What is the Residential Energy Compliance Path?
It identifies an energy code compliance option for a residential project and is submitted with an application for a building permit or Certificate of Occupancy.
What information does the checklist ask for?
It asks for the project address, the selected compliance option, and, for options 2 through 5, the compliance software name and version. It also includes a responsible-party certification and signature line.
Do I need a notary for the Residential Energy Compliance Path?
No. The document has a responsible-party signature line but no notary block; it does not identify a notarized attachment or related sworn step.
How do I submit the Residential Energy Compliance Path?
Submit it with the application for either a building permit or a Certificate of Occupancy. The document does not name a department or provide contact details.

Need something notarized?

This Residential Energy Compliance Path doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.