Brookshire, TX · Waller County
Mobile, Manufactured Building, Modular, or Home Placement Permit
Brookshire residents and contractors use this permit form to request approval for moving a mobile, manufactured, or modular structure in or out.
What this form is
Use this permit form when moving a mobile, manufactured, or modular structure into or out of Brookshire. It lists a $180 fee for either move-in or move-out and warns that the permit fee doubles if work starts before the permit is issued. The form requests contact, property, structure, mover, and license details; move-in applications must include photos of the structure.
Who needs it
Residents, property owners, and contractors moving a mobile, manufactured, or modular structure into or out of Brookshire should use this permit form.
How to submit it
Send the form to [email protected] or use the listed address, 4029 5th Street, Brookshire, Texas 77423. The form lists a $180 move-in or move-out fee.
About notarization
This permit is signed and dated without a notary; for a move-in, attach photos showing the structure’s front, back, and sides.
How to submit this form
- 1
Download the Permit
Download the Brookshire mobile, manufactured building, modular, or home placement permit.
- 2
Complete the Form
Select move-in or move-out and fill in the requested property, structure, contact, and mover details.
- 3
Gather Move-In Photos
For a move-in, attach photos showing the structure’s front, back, and sides.
- 4
Submit to Brookshire
Send the form to [email protected] or use the address listed on the form.
Frequently asked questions
- Do I need a notary for the Brookshire placement permit?
- No. The form has a signature and date line but no notary block. For a move-in, attach photos showing the structure’s front, back, and sides.
- How do I submit the Brookshire placement permit?
- Send the completed form to [email protected] or to the listed address: 4029 5th Street, Brookshire, Texas 77423.
- What does the placement permit form ask for?
- It asks for move-in or move-out details, property and contact information, structure dimensions and serial number, and mover or transporter details.
- What is the listed fee for a move-in or move-out?
- The form lists a $180 fee for either move-in or move-out and says the permit fee doubles if work starts before the permit is issued.
Need something notarized?
This Mobile, Manufactured Building, Modular, or Home Placement Permit doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.
