Hutto, TX · Williamson County
Traffic Impact Study Scope
This scope form and attached determination worksheet help applicants define a proposed development’s traffic study and request a City of Hutto traffic impact analysis determination.
What this form is
Applicants complete the attached Traffic Impact Analysis Determination Worksheet before submitting for a TIA determination. The scope sets out the proposed study’s locations, traffic analysis, and reporting requirements; Hutto Engineering staff must approve and sign it before a Traffic Impact Statement is submitted. The worksheet asks for project, applicant, land-use, trip, and abutting-roadway information.
Who needs it
Applicants proposing a development who need a traffic impact analysis determination and scope approval before submitting a Traffic Impact Statement should use this document.
How to submit it
Submit it to the city department named on the form; check the city website for current contact details.
About notarization
This document is signed without a notary; the applicant and reviewing staff sign and date the scope, and no sworn or notarized attachment is mentioned.
How to submit this form
- 1
Download The PDF
Download the Traffic Impact Study Scope and its attached determination worksheet.
- 2
Complete The Worksheet
Fill in the project, applicant, land-use, trip, and abutting-roadway information requested.
- 3
Arrange Scope Review
Schedule a scoping meeting with Hutto Engineering staff before starting the study; email correspondence with attachments may be acceptable instead.
- 4
Submit The Worksheet
Submit the completed worksheet for TIA determination before a zoning or site plan application; include it with the subsequent application for the identical project.
Frequently asked questions
- What is the Traffic Impact Study Scope?
- It sets requirements for a proposed development’s Traffic Impact Statement and includes a worksheet applicants must complete before submitting for a TIA determination.
- Who completes the determination worksheet?
- The document says the applicant must fill in the Traffic Impact Analysis Determination Worksheet before submitting for a TIA determination.
- Do I need a notary for the Traffic Impact Study Scope?
- No. This document is signed without a notary; the applicant and reviewing staff sign and date the scope, and no sworn or notarized attachment is mentioned.
- How do I submit the Traffic Impact Study Scope?
- The document says the completed determination worksheet must accompany a subsequent application for the identical project. It does not specify how to submit the worksheet.
Need something notarized?
This Traffic Impact Study Scope doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.
