Boyd, TX · Wise County

No notary required

Installation/Replacement of Cell Towers Within the Right-of-Way

This application is for firms proposing to install, extend, replace, or otherwise work on a communication facility in Boyd’s right-of-way.

What this form is

Firms use this application to describe proposed cell tower work within the City of Boyd right-of-way, including a new facility, an extension, a replacement, or other work. It asks for firm and contact details, location, proposed start date and scope, facility height, and distances to nearby subdivisions. The submission must include a sealed plat or map with specified location details and any necessary FCC and/or FAA permits.

Who needs it

A firm proposing to install, extend, replace, or otherwise work on a communication facility within Boyd’s right-of-way needs this application.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This document has no notary block; the firm representative signs and dates it, and the required sealed plat or map and FCC and/or FAA permits are attachments, not notarizations.

How to submit this form

  1. 1

    Download the Application

    Download the cell tower right-of-way application PDF.

  2. 2

    Complete the Form

    Provide firm and contact details, the proposed location and work, and the requested facility information.

  3. 3

    Gather Required Attachments

    Include the required plat or map sealed by a Registered Professional Land Surveyor and any necessary FCC and/or FAA permits.

  4. 4

    Sign and Submit

    Have the firm representative sign and date the application, then submit it to the city department named on the form.

Frequently asked questions

What is the cell tower right-of-way application for?
Firms use it to describe proposed installation, extension, replacement, or other work on a communication facility within the City of Boyd right-of-way.
What must accompany the application?
The submission must include a plat or map sealed by a Registered Professional Land Surveyor, with the specified location and height details, plus any necessary FCC and/or FAA permits.
Do I need a notary for the cell tower right-of-way application?
No. The form has no notary block. The firm representative signs and dates it; the required sealed plat or map and FCC and/or FAA permits are attachments, not notarizations.
How do I submit the cell tower right-of-way application?
Submit it to the city department named on the form. The document does not provide submission contact details, so check the city website for current information.

Need something notarized?

This Installation/Replacement of Cell Towers Within the Right-of-Way doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.