Wickenburg, AZ · Maricopa County
Alternate Power Source & Non-Parallel Interconnect Agreement
Wickenburg electric customers use this application and agreement to request connection of an alternate power generation or storage source.
What this form is
This application and agreement is for customers who pay their electric bill to the Town of Wickenburg and want to connect an alternate power generation or storage source. It collects customer, applicant, contractor, project, equipment, and system details, and requires manufacturer documentation for listed equipment. The agreement states that sources cannot operate in parallel with the Town’s electrical grid and that customers should wait for Town approval before proceeding.
Who needs it
Town of Wickenburg electric customers planning to connect an alternate power generation or storage source should complete this application.
How to submit it
Upload the document through the Wickenburg E-Permit portal simultaneously with the building permit application. The form identifies Community Development and Neighborhood Services and Public Works – Utilities.
About notarization
This document is signed without a notary; the customer and contractor sign and date the form, and no notarized or sworn attachment is specified.
How to submit this form
- 1
Download The Application
Download the Alternate Power Source & Non-Parallel Interconnect Agreement.
- 2
Complete The Form
Enter customer, applicant, contractor, project, equipment, and system information, then sign and date the agreement.
- 3
Gather Equipment Attachments
Include the requested manufacturer cut-sheets or certified sheets for equipment listings.
- 4
Submit Through E-Permit
Upload the document through the Wickenburg E-Permit portal simultaneously with the building permit application.
Frequently asked questions
- What is the Alternate Power Source & Non-Parallel Interconnect Agreement?
- It is an application and agreement for Town of Wickenburg electric customers connecting an alternate power generation or storage source. It collects project and equipment details and sets out non-parallel connection requirements.
- Do I need a notary for the Alternate Power Source Agreement?
- No. The customer and contractor sign and date the form; it does not specify a notarized or sworn attachment.
- How do I submit the Alternate Power Source Agreement?
- Upload it through the Wickenburg E-Permit portal at the same time as the building permit application. The form names Community Development and Neighborhood Services and Public Works – Utilities.
- What attachments does the application request?
- The form asks for manufacturer cut-sheets or certified sheets showing that the photovoltaic inverter or panels and transfer switch meet the listed UL standards.
Need something notarized?
This Alternate Power Source & Non-Parallel Interconnect Agreement doesn’t need a notary — but if you have another Wickenburg form that does, a commissioned online notary can help.
