Oro Valley, AZ · Pima County

No notary required

Pre-Application Process Guide

This guide includes an application and submittal checklist for property owners and applicants seeking preliminary feedback on a proposed development.

What this form is

Use this guide to prepare a pre-application submittal for review by Oro Valley’s Development Review Committee. It includes a general application and checklist for the materials to submit, including ten copies of a development narrative and, if applicable, ten copies of a site plan and location map. The guide says the submittal has no fee and should arrive ten working days before the expected meeting.

Who needs it

Applicants seeking preliminary feedback from the Development Review Committee about the process and broad issues for a proposed development need this package.

How to submit it

Submit the package to the Community and Economic Development Department at 11000 N. La Cañada Drive, Oro Valley, AZ 85737. Include the listed copies; applications should arrive 10 working days before the expected meeting.

About notarization

This document is signed and dated without a notary; the applicant simply signs and dates the application.

How to submit this form

  1. 1

    Download The Guide

    Download the Pre-Application Process Guide and review its application and submittal checklist.

  2. 2

    Complete The Application

    Fill in the property, applicant, owner, consultant, and project description information, then sign, print your name, and date the application.

  3. 3

    Gather The Listed Materials

    Prepare ten copies of the development narrative and, if applicable, ten copies of the site plan and location map; fold and collate the copies into individual packets.

  4. 4

    Submit To The Department

    Submit the package to the Community and Economic Development Department at the address in the guide, 10 working days before the expected meeting.

Frequently asked questions

What is the Oro Valley Pre-Application Process Guide?
It explains the pre-application process and includes a general application and checklist for requesting preliminary feedback from the Development Review Committee about a proposed development.
Do I need a notary for the Pre-Application Process Guide?
No. The application is signed and dated by the applicant without a notary; the guide does not identify any attachment or related step that must be notarized or sworn.
How do I submit the pre-application package?
Submit it to the Community and Economic Development Department at 11000 N. La Cañada Drive, Oro Valley, AZ 85737. The guide says to provide the listed copies and submit 10 working days before the expected meeting.
What materials does the checklist request?
The checklist requests a general application, ten copies of a letter or narrative describing the proposed development, and, if applicable, ten copies of a site plan and location map.