Azusa, CA · Los Angeles County

No notary required

Information on Fire Flow Availability for Building Permit for Single Family Dwellings

This form gathers project and fire-flow information for a single-family dwelling building permit, with sections completed by the applicant and water purveyor.

What this form is

Use this form to provide fire-flow availability, hydrant location, and hydrant size information for a single-family dwelling building permit. Complete Parts I and II(A) to verify fire-flow and hydrant details; complete Part II(B) as well for buildings with fire sprinklers or private on-site fire hydrants. The form also identifies information the Fire Department considers when approving the permit.

Who needs it

Applicants seeking a building permit for a single-family dwelling use this form, with the water purveyor completing the designated sections.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This document is signed without a notary; the applicant and water purveyor sign and date their sections, and no sworn or notarized attachment is identified.

How to submit this form

  1. 1

    Download the Form

    Download the fire-flow availability form for a single-family dwelling building permit.

  2. 2

    Complete Project Information

    Fill in Part I with the building address, owner and applicant details, occupancy, construction, and other requested project information.

  3. 3

    Complete Water Purveyor Sections

    Have the water purveyor complete Part II(A) and, when applicable, Part II(B) for sprinklered buildings or private on-site fire hydrants.

  4. 4

    Submit to the City

    Submit the completed form to the city department named on it; check the city website for current contact details.

Frequently asked questions

What is the fire-flow availability form for?
It records project information and fire-flow availability, hydrant location, and hydrant size for a single-family dwelling building permit.
Who completes the form?
The applicant completes Part I. The water purveyor completes Part II(A), and Part II(B) is completed for buildings with fire sprinklers or private on-site fire hydrants.
Do I need a notary for this fire-flow form?
No. The applicant and water purveyor sign and date their sections; the form identifies no sworn or notarized attachment.
How do I submit the fire-flow form?
Submit it to the city department named on the form; check the city website for current contact details.

Need something notarized?

This Information on Fire Flow Availability for Building Permit for Single Family Dwellings doesn’t need a notary — but if you have another Azusa form that does, a commissioned online notary can help.