El Monte, CA · Los Angeles County

No notary required

Revision Review Submittal Form

This form requests city review of revised project plans and is completed by the project contact submitting changes during a permitted project.

What this form is

Use this form when requesting the City of El Monte to review revised plans during a project for which a permit has been issued. It asks for the project address and permit number, a description and estimated valuation of the changes, contact information, and the types of revisions. Submit revised sheets with clouded changes and a detailed narrative letter describing changes to each sheet.

Who needs it

A project contact requesting review of revised plans during a project with an issued permit should complete and submit this form.

How to submit it

Submit revised sheets to Planning for review before submitting them to Building and Safety for approval to proceed. The form lists City Hall West, 11333 Valley Boulevard, and [email protected].

About notarization

This form is signed without a notary; the signer acknowledges that inactive permits will be placed in pending status, then signs and dates the form.

How to submit this form

  1. 1

    Download The Form

    Download the Revision Review Submittal Form PDF.

  2. 2

    Complete The Form

    Enter the project and contact details, describe the changes, estimate their valuation, and check all applicable revision types.

  3. 3

    Gather Revised Sheets

    Include only sheets being revised, cloud the revisions, and attach a detailed narrative letter describing changes to each sheet.

  4. 4

    Submit For Review

    Submit the revised sheets to Planning before submitting them to Building and Safety for approval to proceed.

Frequently asked questions

Do I need a notary for the Revision Review Submittal Form?
No. The form has a signature and date line but no notary block. The signer acknowledges that permits not yet activated will be put in pending status.
How do I submit the Revision Review Submittal Form?
Submit all revised sheets to Planning for review before submitting them to Building and Safety for approval to proceed. The form lists City Hall West, 11333 Valley Boulevard, and [email protected].
What must I include with this form?
Include only the sheets being revised, with the revisions clouded, and a detailed narrative letter describing the changes to each sheet.
What information does the form request?
It asks for the project address and permit number, a brief description and estimated valuation of the proposed revisions, a primary contact's name and phone number, an email address, and applicable change types.

Need something notarized?

This Revision Review Submittal Form doesn’t need a notary — but if you have another El Monte form that does, a commissioned online notary can help.