Glendora, CA · Los Angeles County

No notary required

Basic Engineering Sheet for Service Connection

Glendora Water customers complete this sheet after approval to request a water meter upsize or downsize and provide service connection details.

What this form is

This sheet records the requested or proposed meter size and details for a water service connection. Glendora Water customers complete it after the Water Division approves a meter upsize or downsize; the procedure says to fill in the yellow-highlighted sections. It asks for applicant and property information, meter and box quantities and sizes, charges, and choices about a pressure regulator and backflow preventer.

Who needs it

Glendora Water customers with Water Division approval for a meter upsize or downsize complete the sheet for Engineering Division processing.

How to submit it

After Water Division approval, complete the sheet and email it to the Engineering Division at [email protected]. The division will email an invoice and payment instructions.

About notarization

This document is completed without a notary; the applicant fills in the name, date, and customer/resident fields, and no notarized or sworn attachment is identified.

How to submit this form

  1. 1

    Download the Sheet

    Download the Basic Engineering Sheet for a water service connection.

  2. 2

    Get Water Division Approval

    Request a Water Division inspection and explain the reason for the meter change. Complete the sheet after approval.

  3. 3

    Complete the Highlighted Sections

    Enter the requested or proposed meter size and complete the yellow-highlighted sections.

  4. 4

    Submit to Engineering

    Email the completed sheet to [email protected]. Follow the invoice and payment instructions sent by Engineering Division.

Frequently asked questions

Do I need a notary for the Basic Engineering Sheet?
No. This document is completed without a notary. Fill in the name, date, and customer/resident fields; the procedure identifies no notarized or sworn attachment.
How do I submit the Basic Engineering Sheet?
After Water Division approval, complete the sheet and email it to the Engineering Division at [email protected]. The division will email an invoice and payment instructions.
Who can use this water meter procedure?
The procedure applies only to Glendora Water customers. If you are not a Glendora Water customer, the document says to contact your water provider.
What should I do before completing the sheet?
Request a Water Division inspection and provide the reason for the meter change. If the division approves the upsize or downsize, complete the yellow-highlighted sections of the sheet.

Need something notarized?

This Basic Engineering Sheet for Service Connection doesn’t need a notary — but if you have another Glendora form that does, a commissioned online notary can help.