Dana Point, CA · Orange County

No notary required

Application for Change of Design Professional

New registered design professionals and contractors use this form to document a change on a Dana Point project and provide required signatures and supporting information.

What this form is

This form documents a change of registered design professional, including an architect, engineer, or contractor, or a change of ownership. The new registered design professional or contractor and the property owner provide wet signatures; the form also requests project, permit, and contact information. Supporting documents and current inspections may be required, and the form states that a fee and outstanding fees are due before the change is executed.

Who needs it

A new registered design professional or contractor, along with the property owner, uses this form to document a change for a project.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This document is signed without a notary; the new design professional or contractor and the property owner wet-sign it, and the signer dates it.

How to submit this form

  1. 1

    Download The Form

    Download the Application for Change of Design Professional PDF.

  2. 2

    Complete The Form

    Enter the project, permit, owner or agent, and existing and new design professional information.

  3. 3

    Gather Supporting Documents

    Include the supporting documents required for the change, such as applicable construction documents or contractor letters.

  4. 4

    Sign And Submit

    Obtain the required wet signatures and submit the form to the city department named on it.

Frequently asked questions

What is the Application for Change of Design Professional?
It documents a change of registered design professional, contractor, or ownership for a project, and requests project details and signatures.
Who completes and signs this form?
The new registered design professional or contractor completes the applicable section. The form also requires the property owner’s wet signature.
Do I need a notary for the Application for Change of Design Professional?
No. The document requires wet signatures and dates, not notarization; the new design professional or contractor and the property owner sign it.
How do I submit the Application for Change of Design Professional?
Submit it to the city department named on the form; check the city website for current contact details.

Need something notarized?

This Application for Change of Design Professional doesn’t need a notary — but if you have another Dana Point form that does, a commissioned online notary can help.