Dana Point, CA · Orange County

No notary required

Roofing Construction and Demolition Waste Reduction and Recycling Application

This form records estimated construction and demolition waste from a roofing project and is completed by the property owner, contractor, or agent.

What this form is

Use this form for materials produced by a roofing project in Dana Point. It asks for project and contact details, roofing work and material estimates, proposed disposal facilities, and a signed verification of the estimates and material handling requirements. It also explains the security deposit, required weight receipts, and conditions for a deposit refund.

Who needs it

A property owner, contractor, or agent completing a roofing project should provide the project details, waste estimates, and signed verification requested on the form.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details. The form identifies the Public Works / Engineering Department.

About notarization

This document is signed without a notary; it contains no notarized or sworn attachment, so the signer just signs and dates it.

How to submit this form

  1. 1

    Download The Form

    Download the roofing construction and demolition waste reduction and recycling form.

  2. 2

    Complete The Project Details

    Fill in the job, owner or contractor, roofing work, material estimates, and proposed disposal facility information.

  3. 3

    Sign And Date The Verification

    Review the verification statement, then print your name, sign, and date the form.

  4. 4

    Submit To The City

    Submit it to the city department named on the form; check the city website for current contact details.

Frequently asked questions

What information does the roofing recycling form request?
It requests project and contact details, descriptions and estimates of roofing materials, proposed disposal facilities, and a signed verification of the estimates.
How do I submit the roofing recycling form?
Submit it to the city department named on the form; check the city website for current contact details. The form identifies the Public Works / Engineering Department.
Do I need a notary for the roofing recycling form?
No. This document is signed without a notary and has no notarized or sworn attachment; the signer just signs and dates it.
When must I provide diversion receipts?
The form says all diversion receipts must be submitted within 60 days of project final or the construction and demolition deposit may be forfeited.

Need something notarized?

This Roofing Construction and Demolition Waste Reduction and Recycling Application doesn’t need a notary — but if you have another Dana Point form that does, a commissioned online notary can help.