Dana Point, CA · Orange County

No notary required

Water Utility Notification Form

This form notifies the appropriate water district about project elements requiring its review or acknowledgment, and is completed by the project applicant.

What this form is

The Water Utility Notification Form identifies project elements that require notification and acknowledgment from the water purveyor, and may involve district plan review, approval, or fee-payment confirmation. The applicant provides permit, job-address, and project-description details, checks applicable items, and submits the form to the appropriate water district. Some projects may also require a will-serve letter or stamped, approved plans.

Who needs it

Applicants whose project includes an item listed on the form, such as a water-service upgrade, sewer connection approval, or temporary construction water service, use it.

How to submit it

Submit the form to the appropriate water district by a method it accepts, such as email, fax, regular mail, or in person. The approved form may be emailed or faxed to the City by the district; electronic submission is listed at [email protected].

About notarization

This form is signed and dated without a notary; it does not identify any notarized attachment or sworn step.

How to submit this form

  1. 1

    Download The Form

    Download the Water Utility Notification Form PDF.

  2. 2

    Complete The Form

    Enter the applicant, permit, date, job address, and project description details, then check the items applicable to the project.

  3. 3

    Gather Required Plans

    If the grease interceptor or sand separator item applies, the form states that two copies of stamped and approved plans are required by the City.

  4. 4

    Submit To The Water District

    Send the form to the appropriate water district using a method it accepts, such as email, fax, regular mail, or in person.

  5. 5

    Return The Approved Form

    The district may email or fax the approved, signed form to the City; electronic submission is listed at [email protected].

Frequently asked questions

What is the Water Utility Notification Form for?
It notifies the appropriate water district about project elements that may require acknowledgment, plan review, approval, or confirmation of fee payments.
Who completes this form?
The project applicant provides the permit number, date, job address, and project description, then checks the items applicable to the project.
How do I submit the Water Utility Notification Form?
Submit it to the appropriate water district by a method the district accepts. The approved form may be returned to the City by the district via email or fax.
Do I need a notary for the Water Utility Notification Form?
No. This form is signed and dated without a notary, and it does not identify a notarized attachment or sworn step.

Need something notarized?

This Water Utility Notification Form doesn’t need a notary — but if you have another Dana Point form that does, a commissioned online notary can help.