Construction Water Meter Permit

Contractors use this application to request a construction water meter permit for work involving a fire hydrant in Fountain Valley.

What this form is

This application requests a permit to install or remove a construction water meter on a fire hydrant in Fountain Valley. It asks for the applicant’s business and contact details, license information, project location and description, and hydrant details. The applicant signs to certify compliance with the listed requirements and accepts responsibility for the work.

Who needs it

Contractors seeking a construction water meter permit for a fire hydrant in Fountain Valley need to complete this application.

How to submit it

Email the application and plans to [email protected]. The form lists a $2,500 construction water meter deposit and a $500 minimum water usage deposit, along with other possible fees.

About notarization

This permit is signed and dated without a notary; the form lists plans as a submission attachment and does not require a notarized or sworn attachment.

How to submit this form

  1. 1

    Download The Permit

    Download the Construction Water Meter Permit PDF.

  2. 2

    Complete The Application

    Enter applicant, license, project, and hydrant details, then sign and date the form.

  3. 3

    Gather The Plans

    Include the plans listed as part of the application submission.

  4. 4

    Email The Submission

    Email the application and plans to [email protected].

Frequently asked questions

Do I need a notary for the Construction Water Meter Permit?
No. The permit has a contractor signature and date field but no notary block; the listed plans attachment is not identified as notarized or sworn.
How do I submit the Construction Water Meter Permit?
Email the completed application and plans to [email protected], as directed on the form.
What information does the application request?
It asks for business and contact information, license details, the project location and description, and fire hydrant information.
What fees are listed on the form?
The form lists a $2,500 construction water meter deposit, a $500 minimum water usage deposit, and possible hydrant meter installation or relocation fees.