Fountain Valley, CA · Orange County
Residential Electrical Vehicle Charging Stations Expedited Review Eligibility Checklist
Fountain Valley applicants use this checklist to assess expedited review eligibility and document plan requirements for a residential electric vehicle charging station permit.
What this form is
Use this checklist when preparing plans and documents for expedited review of a residential electric vehicle charging station project in Fountain Valley. It asks applicants to identify the proposed charging station and power level, confirm plan and document requirements, and provide the project address and applicant signature. Items checked “NO” should be revised; the city may instead use its standard plan review process.
Who needs it
Applicants seeking expedited plan review for a residential electric vehicle charging station permit in Fountain Valley should complete this checklist with their plans and supporting documents.
How to submit it
Submit electronically through the City’s Plan Check Center after applying for a permit online and uploading plans, or submit three hard-copy plan sets of at least 11 by 17 inches.
About notarization
This checklist is signed without a notary; the applicant signs and provides a printed name and date.
How to submit this form
- 1
Download The Checklist
Download the residential EV charging expedited review eligibility checklist.
- 2
Complete The Checklist
Select the charging station type and power level, answer the plan requirement checks, and provide the project address and applicant signature.
- 3
Gather Plans And Supporting Documents
Prepare the required plans and supporting documents, including three plan sets for hard-copy submission or electronic files for upload.
- 4
Submit To The City
Apply for a permit online and upload plans through the City’s Plan Check Center, or submit three hard-copy plan sets.
Frequently asked questions
- What does the residential EV charging checklist do?
- It helps applicants check eligibility and plan requirements for expedited review of a residential electric vehicle charging station project.
- How do I submit the EV charging checklist?
- Apply for a permit online and upload plans through the City’s Plan Check Center, or submit three hard-copy plan sets of at least 11 by 17 inches.
- Do I need a notary for the EV charging checklist?
- No. The applicant signs and provides a printed name and date; the checklist does not require notarization.
