Laguna Niguel, CA · Orange County
Expedited Permitting Process for Electric Vehicle Charging Stations
This checklist helps Laguna Niguel property owners, contractors, and other applicants prepare and submit plans for an electric vehicle charging station permit.
What this form is
Use this form and checklist when applying for a building permit for an electric vehicle charging station in Laguna Niguel. It asks for project and contact information, charging station details, and plan-sheet references, and lists the drawings and supporting documents to include. Applicants also complete the applicable residential or commercial building permit application and submit the required materials for review.
Who needs it
Property owners, contractors, and other applicants proposing an electric vehicle charging station in Laguna Niguel need this checklist with the applicable building permit application.
How to submit it
Submit the completed checklist and required documents to the Building and Safety Division in person at Laguna Niguel City Hall, by email at [email protected], or through the City’s Online Permitting Center.
About notarization
This document is signed without a notary; the preparer signs and dates the certification, and no notarized attachment or related step is specified.
How to submit this form
- 1
Download the Checklist
Download the electric vehicle charging station permitting form and checklist.
- 2
Complete the Checklist
Provide project and contact information, answer the checklist items, identify plan-sheet references, and sign and date the preparer’s certification.
- 3
Gather Required Documents
Include the applicable residential or commercial building permit application, required plans, and supporting documents. Explain unmet checklist items in a written letter.
- 4
Submit to the City
Submit the completed materials to the Building and Safety Division in person, by email, or through the City’s Online Permitting Center.
Frequently asked questions
- Do I need a notary for the EV charging station permitting checklist?
- No. The preparer signs and dates the certification; the document does not specify a notarized attachment or related step.
- How do I submit the EV charging station permitting checklist?
- Submit the completed checklist and required documents in person to the Building and Safety Division, by email at [email protected], or through the City’s Online Permitting Center.
- What other documents go with the checklist?
- The checklist is submitted with the applicable residential or commercial building permit application and required plans and supporting documents. Explain any checklist item not completed or met in a written letter.
- Does the checklist cover residential and commercial charging stations?
- Yes. The instructions reference both residential and commercial building permit applications, and the checklist covers project and plan requirements for electric vehicle charging stations.
Need something notarized?
This Expedited Permitting Process for Electric Vehicle Charging Stations doesn’t need a notary — but if you have another Laguna Niguel form that does, a commissioned online notary can help.
