Beaumont, CA · Riverside County

No notary required

Construction & Demolition Waste Diversion Report

This report is for Beaumont construction and demolition project applicants to document how project waste was diverted or disposed of.

What this form is

Beaumont requires this report for construction and demolition projects, and it must be approved before final inspection or issuance of a certificate of occupancy. Applicants report project and contractor details, material weights diverted and landfilled, and the project’s diversion rate. Include legible, dated receipts showing certified weights for all reported materials; the form says submittals without required documentation will not be approved.

Who needs it

Applicants for Beaumont construction and demolition projects use this report to document waste diversion and provide certified weight receipts.

How to submit it

Submit the completed form to the Solid Waste & Recycling Division or email it to [email protected]. Include copies of legible, dated receipts showing certified weights for reported materials.

About notarization

This document is signed without a notary; the signer signs and dates the report, and the required weight receipts are not identified as notarized or sworn.

How to submit this form

  1. 1

    Download the Report

    Download the Construction & Demolition Waste Diversion Report PDF.

  2. 2

    Complete the Form

    Enter project and contractor details, material weights in tons, and the diversion rate; sign and date the report.

  3. 3

    Gather Weight Receipts

    Include legible, dated receipts showing certified weights for all reported diverted and landfilled materials.

  4. 4

    Submit to Beaumont

    Send the completed report and receipts to the Solid Waste & Recycling Division or email them to [email protected].

Frequently asked questions

Do I need a notary for the Construction & Demolition Waste Diversion Report?
No. The report calls for a signature and date, not notarization. Include the required legible, dated receipts showing certified weights; the document does not identify them as notarized or sworn.
How do I submit the Construction & Demolition Waste Diversion Report?
Submit the completed form to Beaumont’s Solid Waste & Recycling Division or email it to [email protected]. Include copies of the required receipts showing certified weights.
What supporting documents must accompany the report?
Include legible, dated receipts showing certified weights for materials that were recycled, reused, composted, salvaged, or landfilled. The form says submissions without required documentation will not be approved.
When must the report be approved?
The form states that the report must be approved before final inspection or issuance of a certificate of occupancy.

Need something notarized?

This Construction & Demolition Waste Diversion Report doesn’t need a notary — but if you have another Beaumont form that does, a commissioned online notary can help.