Hemet, CA · Riverside County

No notary required

Waste Management Plan

This plan records estimated and actual construction waste and is completed by a property owner or contractor for a City of Hemet building project.

What this form is

The Waste Management Plan documents how construction waste from a project will be sent to landfill, reused, or recycled. The form says non-hazardous construction waste must be reused or recycled at a minimum of 65%; it includes an estimated-waste table to complete before permit issuance and an actual-waste table to complete after construction. It also lists alternative compliance options and asks for project details, waste amounts, and a contractor or owner signature.

Who needs it

A property owner or contractor completing a building project in Hemet uses this plan to report estimated and actual construction waste.

How to submit it

The form identifies the City of Hemet Community Development Department Building Division. For the CR&R-bin option, provide receipts to the Building Division; for the weight-based option, provide receipts to the Solid Waste Department before final.

About notarization

This document is signed without a notary; the contractor or owner signs it, and the form identifies no notarized or sworn attachment.

How to submit this form

  1. 1

    Download The Plan

    Download the Waste Management Plan PDF.

  2. 2

    Complete Project Details

    Enter the owner, contractor, job address, phone number, permit number, estimated project cost, and project type.

  3. 3

    Estimate Construction Waste

    Before permit issuance, complete the estimated-waste table or indicate an alternative compliance option.

  4. 4

    Record Actual Waste

    After construction, complete the actual-waste table and indicate whether the 65% goal or alternative compliance was achieved.

  5. 5

    Provide The Plan And Receipts

    Follow the form's receipt instructions for the selected option and contact the City of Hemet Building Division.

Frequently asked questions

What does the Waste Management Plan document?
It records estimated and actual construction waste, including amounts sent to landfill or reused or recycled, along with project and contractor or owner information.
When are the plan tables completed?
The form says to complete the estimated-waste table before permit issuance and the actual-waste table after construction.
Do I need a notary for the Waste Management Plan?
No. The contractor or owner signs the plan, and it identifies no notarized or sworn attachment.
How do I submit the Waste Management Plan?
The form identifies the City of Hemet Building Division. Receipts for the CR&R-bin option go to that division; receipts for the weight-based option go to the Solid Waste Department before final.

Need something notarized?

This Waste Management Plan doesn’t need a notary — but if you have another Hemet form that does, a commissioned online notary can help.