Lake Elsinore, CA · Riverside County
Mining Inspection Submittal Application and Checklist
Mine owners or developers use this application and checklist to initiate a mining inspection by submitting mine information, required documents, and fees to the city.
What this form is
Complete one application for each mine ID number and submit it to initiate Mining Inspection. The checklist asks for a reclamation plan and any amendments, a current financial assurance estimate, and a permit only if the site is not vested; the inspector may require other documents. The form also requests mine and contact details and notes an inspection deposit and city cost recovery of fees.
Who needs it
A mine owner or developer should complete one application per mine ID number to initiate Mining Inspection.
How to submit it
Submit the completed form with the requested documents and fees to the Engineering Division at 130 South Main Street, Lake Elsinore, CA 92530.
About notarization
This document is signed without a notary; the signer just signs and dates it, and the form mentions no notarized or sworn attachment.
How to submit this form
- 1
Download The Application
Download the Mining Inspection Submittal Application and Checklist.
- 2
Complete The Form
Fill in the mine ID, mine and contact information, and other requested details; complete one application per mine ID.
- 3
Gather Required Documents
Include the reclamation plan and amendments, current financial assurance estimate, and a permit if the site is not vested.
- 4
Submit To The City
Submit the form with the requested documents and fees to the Engineering Division at 130 South Main Street, Lake Elsinore, CA 92530.
Frequently asked questions
- What is the Mining Inspection Submittal Application and Checklist?
- It is the form mine owners or developers complete to initiate Mining Inspection, with a checklist of documents to submit for each mine ID number.
- What documents does the mining inspection checklist request?
- It lists a reclamation plan, including amendments, and a current financial assurance estimate. A permit is required only if the site is not vested; the inspector may require other documents.
- Do I need a notary for the Mining Inspection Submittal Application?
- No. This document is signed without a notary; the signer just signs and dates it. It mentions no notarized or sworn attachment.
- How do I submit the Mining Inspection Submittal Application?
- Submit the completed form with the requested documents and fees to the Engineering Division at 130 South Main Street, Lake Elsinore, CA 92530.
Need something notarized?
This Mining Inspection Submittal Application and Checklist doesn’t need a notary — but if you have another Lake Elsinore form that does, a commissioned online notary can help.
