Lodi, CA · San Joaquin County

No notary required

Alternate Materials or Methods of Construction or Design Request

This request lets a project owner or design professional ask the Building Division to approve alternate materials or construction or design methods for a project.

What this form is

Use this request to seek approval of alternate materials or methods of construction or design for a project. The form asks for project and building details, the subject of the alternative, the applicable code requirement, the proposed alternative, and a justification. Submit two copies of the completed request and supporting documents, including plans showing the proposed alternative; the Building Official makes the approval decision.

Who needs it

Project owners, architects, engineers, or contractors seeking approval of an alternate material or construction or design method can submit this request.

How to submit it

Fully complete the request and submit two copies of all documents, including plans showing the proposed alternative, to the Community Development Department, Building Division, at 221 West Pine St./PO Box 3006, Lodi, CA 95241-1910.

About notarization

This request is signed without a notary; the requester and owner sign and date it, and no notarized or sworn attachment is identified.

How to submit this form

  1. 1

    Download The Request

    Download the Alternate Materials or Methods of Construction or Design Request PDF.

  2. 2

    Complete The Request

    Provide the project details, code requirement, proposed alternative, justification, and required signatures and date.

  3. 3

    Gather Supporting Documents

    Prepare two copies of all documents, including plans showing the proposed alternative and any supporting references or reports.

  4. 4

    Submit To The Building Division

    Submit the two copies to the Community Development Department, Building Division, at the address shown on the form.

Frequently asked questions

Do I need a notary for the Alternate Materials Request?
No. The request has signature and date fields but no notary block; the document does not identify any notarized or sworn attachment.
How do I submit the Alternate Materials Request?
Submit two copies of the completed request and all documents, including plans showing the proposed alternative, to the Community Development Department, Building Division, at the address on the form.
What information does the request ask for?
It asks for project and building details, the subject of the alternative, the applicable code requirement, the proposed alternative, and a justification.

Need something notarized?

This Alternate Materials or Methods of Construction or Design Request doesn’t need a notary — but if you have another Lodi form that does, a commissioned online notary can help.