Preliminary Ministerial Review Clearance – Accessory Dwelling Units

Property owners or applicants use this application to request preliminary planning clearance for a proposed accessory dwelling unit in East Palo Alto.

What this form is

This application lets the Planning Division review a proposed accessory dwelling unit for conformance with the city’s objective development, design, and subdivision standards. The clearance is required before applying for a building permit, but it does not approve construction. Applicants provide project, property, and contact details; describe the proposed unit; answer site-condition questions; and sign the certification and indemnification agreement.

Who needs it

Property owners or their authorized applicants proposing an accessory dwelling unit in East Palo Alto need to request this preliminary clearance before applying for a building permit.

How to submit it

The form names the Community & Economic Development Department, Planning Division, at 1960 Tate Street, East Palo Alto, CA 94303, and lists [email protected]. It does not state a submission method.

About notarization

This document is signed without a notary; the applicant or owner signs and dates the certification, and an owner authorization letter may be submitted instead of the owner’s signature.

How to submit this form

  1. 1

    Download The Application

    Download the Preliminary Ministerial Review Clearance application for accessory dwelling units.

  2. 2

    Complete The Application

    Provide project and property details, describe the proposed ADU, answer the site-condition questions, and sign and date the certification.

  3. 3

    Gather Applicable Attachments

    If applicable, prepare an owner authorization letter in place of the property owner’s signature. The form also identifies flood-related information that may be required.

  4. 4

    Submit To The Planning Division

    The form names the Planning Division at 1960 Tate Street and lists [email protected]; it does not specify a submission method.

Frequently asked questions

Do I need a notary for the ADU preliminary clearance application?
No. This document is signed without a notary. The applicant or owner signs and dates the certification; an owner authorization letter may be submitted instead of the owner’s signature.
What does the preliminary clearance do?
It confirms whether the proposed ADU conforms to the city’s objective development, design, and subdivision standards. It does not grant approval to construct the ADU.
How do I submit the ADU preliminary clearance application?
The form names the Community & Economic Development Department, Planning Division, at 1960 Tate Street, East Palo Alto, CA 94303, and lists [email protected]. It does not specify how to submit.

Need something notarized?

This Preliminary Ministerial Review Clearance – Accessory Dwelling Units doesn’t need a notary — but if you have another East Palo Alto form that does, a commissioned online notary can help.