Temporary Construction Meter Application

Dixon’s Water Division application lets a company or customer request a temporary construction meter for a project and provide the requested contact and meter-location details.

What this form is

Use this application to request a temporary construction meter from the City of Dixon Water Division. It asks for company and contact information, a mailing address, meter location, dates, and estimated water needs. The document lists a deposit and monthly charges, explains meter installation and return, and says to contact billing when the project is complete or the meter is no longer needed.

Who needs it

A company or customer needing a temporary construction meter for a project in Dixon should complete the application and provide the requested project and contact details.

How to submit it

The form lists City of Dixon Utility Billing at 600 East A Street, Dixon, CA 95620, 707-678-7008, and [email protected]. It states that a $1,800 deposit is required and lists cash, check, or money order as payment options.

About notarization

This document is signed without a notary; it contains no notarized or sworn attachment, so the signer just signs and dates it.

How to submit this form

  1. 1

    Download The Application

    Download the Temporary Construction Meter Application PDF.

  2. 2

    Complete The Application

    Provide the company, contact, mailing address, meter location, requested dates, and estimated water needs, then sign and date it.

  3. 3

    Prepare The Deposit

    The form requires a $1,800 deposit and lists cash, check, or money order as payment options.

  4. 4

    Contact Utility Billing

    Use the Utility Billing address or email listed on the form to ask how to submit the application.

Frequently asked questions

What information does the Temporary Construction Meter Application ask for?
It asks for company and contact details, mailing address, meter location, requested dates, and estimated water needs.
What deposit and fees does the application list?
The form lists a $1,800 deposit, a $100 application fee, a $100 monthly rental fee, water-use charges, and a $75 relocation fee.
Do I need a notary for the Temporary Construction Meter Application?
No. This document is signed without a notary and contains no notarized or sworn attachment; the signer just signs and dates it.
How do I submit the Temporary Construction Meter Application?
The form lists Utility Billing at 600 East A Street, Dixon, CA 95620, and [email protected]. It does not give a specific submission method.

Need something notarized?

This Temporary Construction Meter Application doesn’t need a notary — but if you have another Dixon form that does, a commissioned online notary can help.