Residential Model Home Building Permit Application
Developers use this application to request permits for model homes in a subdivision before its final plat is recorded.
What this form is
Tucker allows a limited number of model homes before a subdivision’s final plat is recorded, and this application requests a Model Home Permit. It asks for subdivision and project details, property owner and applicant information, construction and site information, and signatures. The application says approval from DeKalb Watershed Management or the DeKalb Board of Health is required before a permit can be issued.
Who needs it
A property owner, architect, engineer, general contractor, or authorized agent seeking a model home permit for a subdivision should complete this application.
How to submit it
Submit the application to Building and Permitting at 1975 Lakeside Parkway, Suite 350, Tucker, GA 30084, or email [email protected].
About notarization
This document is signed without a notary; the signer makes a sworn declaration and signs and dates the application.
How to submit this form
- 1
Download The Application
Download the Residential Model Home Building Permit Application.
- 2
Complete The Application
Provide the subdivision, project, property owner, applicant, and contractor information requested.
- 3
Gather Supporting Documents
Include supporting documentation and an 11-by-17-inch site plan identifying the proposed model home lots.
- 4
Submit To Building And Permitting
Submit the application to Building and Permitting at the listed Tucker address or email.
Frequently asked questions
- Do I need a notary for the Residential Model Home Building Permit Application?
- No. The form has no notary block; the signer makes a sworn declaration and signs and dates the application.
- How do I submit the Model Home Building Permit Application?
- Send it to Building and Permitting at 1975 Lakeside Parkway, Suite 350, Tucker, GA 30084, or email [email protected].
- How many model home permits can a subdivision receive?
- The form states that permits are limited to 10% of the total units or lots within the development.
- What must be provided with the application?
- The form lists supporting documentation and an 11-by-17-inch site plan showing the proposed model home lots. It also requires approval from DeKalb Watershed Management or the DeKalb Board of Health before issuance.
Need something notarized?
This Residential Model Home Building Permit Application doesn’t need a notary — but if you have another Tucker form that does, a commissioned online notary can help.