McDonough, GA · Henry County

No notary required

Cell Tower Permit Application

Wireless providers and their applicants use this application to request a permit to collocate small wireless facilities or install, modify, or replace a pole in the public right of way.

What this form is

The City of McDonough Community Development Department application covers small wireless facility collocations and specified pole work in the public right of way. It asks for applicant and consultant contact details, the work location, scope, pole counts, project dates, and certification. Applicants should attach applicable construction drawings, a structural report for collocation, visual depictions if needed, and a map showing facility locations relative to right-of-way boundaries.

Who needs it

Wireless providers or applicants acting on their behalf need this form to request covered small wireless facility or pole work in the public right of way.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details. The form says the permit fee is submitted with the application and lists fee calculations.

About notarization

This document is signed without a notary; the applicant and witness sign, and the applicant provides a printed name and title.

How to submit this form

  1. 1

    Download The Application

    Download the Cell Tower Permit Application PDF.

  2. 2

    Complete The Application

    Provide applicant and consultant contact information, work location, scope, pole counts, project dates, and certification.

  3. 3

    Gather Applicable Attachments

    Attach applicable construction drawings, a structural report for collocation, visual depictions if needed, and a right-of-way location map.

  4. 4

    Submit To The City

    Submit the application and permit fee to the city department named on the form; check the city website for current contact details.

Frequently asked questions

What does the Cell Tower Permit Application cover?
It requests a permit to collocate small wireless facilities in the public right of way or to install, modify, or replace a pole there for collocation.
What attachments does the application request?
Applicable attachments include detailed construction drawings, a structural report for collocation, visual depictions if not included in the drawings, and a map locating facilities relative to right-of-way boundaries.
Do I need a notary for the Cell Tower Permit Application?
No. The document has applicant and witness signature lines and does not include a notary block.
How do I submit the Cell Tower Permit Application?
Submit it to the city department named on the form; check the city website for current contact details. The form says the permit fee is submitted with the application.

Need something notarized?

This Cell Tower Permit Application doesn’t need a notary — but if you have another McDonough form that does, a commissioned online notary can help.