This request form lets an owner or company ask for temporary construction or test power at a location before its final inspection.

What this form is

The form requests temporary construction power or test power for a location before final inspection. It asks for the date, location, owner, and signature, and explains that the signer assumes responsibility for the electrical installations until a final inspection is requested. The form also states that temporary service does not authorize occupancy and may be disconnected if the building is occupied before final inspection.

Who needs it

An owner or company requesting temporary construction or test power for a location before its final inspection needs this form.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This document is signed and dated without a notary; it includes no notarized or sworn attachment, so the requester just signs and dates it.

How to submit this form

  1. 1

    Download The Request

    Download the Construction Power/Test Power Request PDF.

  2. 2

    Complete The Form

    Provide the date, location, and owner, then sign and print your name and company.

  3. 3

    Review The Responsibilities

    Read the form's statements about electrical installations, final inspection, and occupancy.

  4. 4

    Submit To The City

    Submit it to the city department named on the form; check the city website for current contact details.

Frequently asked questions

What does the Construction Power/Test Power Request do?
It lets an owner or company request temporary construction or test power for a location before final inspection and describes responsibilities associated with the service.
Who should complete this request?
An owner or company requesting temporary construction or test power for a location should complete the form, providing the date, location, owner, and signature.
Do I need a notary for the Construction Power/Test Power Request?
No. This document is signed and dated without a notary, and it identifies no notarized or sworn attachment.
How do I submit the Construction Power/Test Power Request?
Submit it to the city department named on the form; check the city website for current contact details.

Need something notarized?

This Request for Construction Power/Test Power doesn’t need a notary — but if you have another Columbus form that does, a commissioned online notary can help.