Hillsboro, IL · Montgomery County

No notary required

Culvert/Driveway Permit Application

Hillsboro property owners or applicants use this application to request permission to construct a culvert or driveway on a city right-of-way.

What this form is

This application requests City of Hillsboro permission to construct a culvert or driveway on a city right-of-way. Applicants provide an address and details about the pipe material, wall thickness or gauge, and joint type, and must include a sketch showing the location, length, and pertinent details. The permit section records a decision, and the certification section records whether the completed installation conforms to the permit.

Who needs it

Anyone requesting permission to construct a culvert or driveway on a City of Hillsboro right-of-way needs to complete this application.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This application is signed and dated without a notary; the applicant must attach a sketch showing the location, length, and pertinent details.

How to submit this form

  1. 1

    Download The Application

    Download the City of Hillsboro Culvert/Driveway Permit Application.

  2. 2

    Complete The Application

    Enter the address and pipe material, wall thickness or gauge, and joint type; sign and date the application.

  3. 3

    Prepare The Sketch

    Attach a sketch showing the proposed location, length, and pertinent details.

  4. 4

    Submit To The City

    Submit the application and sketch to the city department named on the form; check the city website for current contact details.

Frequently asked questions

What does the Hillsboro culvert/driveway permit application request?
It requests permission to construct a culvert or driveway on a City of Hillsboro right-of-way and asks for the address and pipe specifications.
What should I include with the application?
Include an applicant-prepared sketch showing the proposed location, length, and pertinent details. The application also asks for pipe material, wall thickness or gauge, and joint type.
Do I need a notary for the Hillsboro culvert/driveway permit application?
No. The application is signed and dated without a notary. The applicant must attach a sketch showing the location, length, and pertinent details.
How do I submit the Hillsboro culvert/driveway permit application?
The form does not give submission instructions or name a department. Submit it to the city department named on the form; check the city website for current contact details.

Need something notarized?

This Culvert/Driveway Permit Application doesn’t need a notary — but Illinois residents can notarize other documents online with a commissioned online notary.